Sunday, March 10, 2013

Demolition Weekend Photos

Warning - this post is photo heavy.


If you haven't started from the beginning of the blog, I'll give you a quick reminder that the original house was built roughly in the mid to late 1700's and is all log cabin. From there, we aren't 100% sure if the additions were done in one or two phases, but leaning toward one, in the late 1800's. Each time we remove more of the wall coverings, we are finding more neat things on the logs or original part of the log house. Like Roman numerals carved into the logs - in order - to apparently keep track of the order! Or windows.



The top left picture is where the built in bookcase was in the living room. The top right is the view from the front porch of the side wall of the house - the living room wall. When the built in bookcase was knocked out, we found the original window. The partial wall blocking the full window is what is seen on the front porch.



Look how big our bathroom is now that the wall was knocked out! The hole in the floor is where the tub sat.

All those walls....GONE!

Out comes the final piece of carpet off the stairs.

That's what they looked like before.


Chopping old 80's furniture for the burn pile.


Removing the rough hewn lumber from the walls. The lumber held the drywall in place against the logs. We have been saving all the wood for a billion and one projects Ghon has in mind to reuse it.


This is how we roll - the attending surgeon prepares the pork shoulder.


Cutting the floor to expose the support beams underneath.


After the tub was removed - the the floor boards, a damaged support log was found. This discovery halted progress for the rest of the day. Ghon has started pulling up floor boards one by one, trying to save them to reinstall after the repairs are complete.

All in all, a ton was done last weekend. I'm finally finishing this post after another 3 day weekend working. But that, is for another post.

Monday, March 4, 2013

Demolition Before and After Videos

On Sunday, March 3, Ghon and I went back at the house. We were joined by Ghon's sister Cindy and her friend Rod, and my best friend Missy, her husband Kevin and daughter Rylee.  Rylee helped entertain the kids inside and outside while we worked inside.

Ghon and Kevin worked in the living room sistering more joists. By the day's end, all of the joists in the living room were sistered, a major goal for the weekend. We still plan to add additional joists in between the existing joists, and some of the previously fixed joists may be doubled up on. However, every board we had was used - and that is a success. Thanks, Kevin!

Cindy, Rod, Missy and I tackled the storage room and attic. Trash was pulled, the burn pile added to, and quite a few items set aside for either a yard sale or major donation. Rod manned the attic, handing down boxes to Cindy. Cindy and I rummaged, while Missy and I ran stuff out and sorted. We were also able to pull the carpet from the last bedroom. The only carpet that remains is in the storage room. With everyone's help, we were able to actually make a path to walk into the attic.

Ghon took before and after videos of the weekend. The before is before the weekend; not the entire project. After is at the end of the day Sunday. What a difference.

The before......

....and the after.


What do you think? Yes, still lots to do, but great progress was made.

I'll do another post with pictures later this week. For now, I need to figure out how I am going to cover the dumpster before we get a foot of snow on Wednesday. Don't want to pay for the weight of snow when it is time for pick up!

Saturday, March 2, 2013

Demolition Day One

Friday - March 1, 2013


Ghon and I both took off work on Friday to prepare as much as possible for the big demolition 'party' on Saturday. After taking the kids to daycare, we headed out to Home Depot and Lowes to purchase a few additional supplies, of which included a new mailbox. The old mailbox’s door didn’t like staying closed, and as a result, last weekend we found several pieces of our mail near the creek bed – and it was 2 months old. Not a good thing. That’s probably where the first phone bill that I never saw is buried.

Ghon did the HD shopping while I took a phone call for work. A quick trip to Lowes and we headed back to the house where our friend Tim was going to meet up with us to give us a hand. I headed back out into town to pick up the drinks we needed for Saturday.  When I returned, Ghon had the new mailbox post installed (but no mailbox installation) and was getting ready to work inside.
The task of the day was to get as much sistering of the floor joists complete. In the middle of the room, the joist was cracked and completely separated. Here, three of us installed two new beams. This basically acted as a new joist and the broken joists as the sister beams. After securing this section, we hauled out a ton of drywall and lumber and tried to neaten up a bit for the next day.

That evening, the kids helped pick up some of their toys while we started food prep. Three pork shoulders went on the smoker, macaroni and cheese and baked beans were prepared, and two BBQ sauces made. I pulled the pork off the smoker about 1am before going to bed.

Saturday, March 02, 2013
The Jonathan alarm went off at 5; and the Genevieve alarm when off – and never hit snooze – at 6am. Ghon rolled out of bed and to the house about 7, while I got the kids ready and got our sitter Aly oriented to the house and waited for her reinforcements. I baked a coffee cake and started packing the truck.  Our friends Larry and Charlotte were the first to arrive, followed by Charlie, Tim, Cassy, Clint, Kevin, Dave & Jen (to our live-in house where Jen helped watch the kids), Travis, and last but not least, Kathryn and Cecil. When I arrived everyone was busy working in multiple areas of the house.

Before everyone arrived, Ghon made a video tour of the house. We’ll make video tour #2 tomorrow afternoon, and I’ll post more pictures then. I'm having issues uploading the video to the blog, so bare with me.

The teamwork was amazing. Husband and wife demoing closets and pulling carpet in the master bedroom, rough hewn lumber being removed from the original logs in the living room and full on demolition of the lower level bathroom – everywhere there was activity. A mallet was swung to knock out a wall while I ripped carpet up off the stairs. We cut a hole in the screen of the upper level porch to toss out carpet, sofa cushions and just general trash – and someone below hauled and sorted to the burn pile or dumpster. It was amazing.

For as much as we were able to finish, we did lose about three hours of time when a big issue was discovered. I had to make a trip to Lowes for additional washers and bolts. When I left, there was work everywhere. When I returned, I walked into the living room with everyone staring into a hole – and saying “we found a body.”  Well, while they did not find a body, yet, they did produce a skull. Now, I am petrified of going in the attic because I don’t want to see the snake skins or run into a snake. I can only imagine what I would have done if they showed me a human skull. Thankfully, it was an animal of some sort, but no one is quite sure of what kind of animal. I’ve decided to dub it a unicorn. They guys are thinking a sheep or goat, but yeah, I’m going with unicorn. Ghon just Googled sheep skulls, and is going with sheep. Now why is a sheep skull buried in our house foundation…

Only one side of the floor was able to be resupported and leveled, knowing we could not find a way into left side of the room. After the bathtub was removed, Ghon could see dirt near the plumbing and decided to pull off the plywood to see underneath. Here is where you can either 1 – curse that he did, because he found a new issue. Or 2 – be thankful he did as we found a support log with damage that needs to be corrected. The discovery brought us to a standstill. There wasn’t enough room to get under the floor to jack the floor to support and level it out. There was also a concern regarding putting pressure on the floor to jack up the living room ceiling joists. There could be a plan in place that starts tomorrow – but it took a lot of deliberations and a variety of ideas to come up with a plan.

After this discovery, the damaged beam, not just the skull, a fire was built, a BBQ dinner served and a bit of relaxation followed. We slowly started bidding our friends goodbye, and were able to get a pic with most of our help. 

Remember the long list of to-do items? Here’s what we did:
Inside Jobs
Hang sister joists
Install new joists
Remove remaining drywall from living room
Remove drywall from dining room
Remove electric from living room
Remove electric from dining room
Remove linoleum from kitchen floor
Remove linoleum from bathroom floor
Remove everything BUT the toilet from lower bath
Remove drywall from bathroom
Remove all carpet and padding from 2nd floor
Remove carpet from stairs
Empty/clean out storage room
Remove closet from master bedroom
Remove partition from sitting room
Finish removing partition from bdrm/storage rm
Trash mattress/boxsprings
Trash recliners/chairs & wood frame furniture
Haul wood furniture to fire pit & cut
Frame in two walls, closet, bathroom wall in living room
Empty/clean out attic

What a success!

Larry & Charlotte, Kathryn & Cecil, Kevin, Dave & Jen, Cassy, Tim, Charlie, Clint, Travis & Aly – THANK YOU. Thank you for driving the distances you did to wreak havoc on our house (or watch our kids). You really did take us leaps and bounds further in this project, and we really can’t thank you enough for spending your day with us. What an amazing day. We are nowhere near ‘done’ this project, but are so much further along with the help of great friends. For those of you that didn’t make it and wanted to – let’s pick a day to share the fun. There will be so much more to do.


Tuesday, February 26, 2013

Demo Day Update

Demo/construction day is almost upon us. 

Ghon is taking off Thursday and Friday to work and prepare; I will be off Friday to do some shopping, food prep, and work.  We've had a sitter cancel and a new sitter (Thanks, Jen!!) step in so that we don't have to worry about the kids. Ghon has ordered some additional lumber to round out the projects. 

The to do list so far:

Inside jobs


Remove remaining drywall from living room
Remove drywall from dining room
Remove electric from living room
Remove electric from dining room
Remove linoleum from kitchen floor
Remove linoleum from bathroom floor
Remove cabinet, countertop and vanity from lower bath
Remove all carpet and padding from 2nd floor
Remove carpet from stairs
Empty/clean out attic
Empty/clean out storage room
Remove closet from master bedroom
Remove partition from sitting room
Finish removing partition from bedroom/storage room
Trash mattress/boxsprings
Trash recliners/chairs and cushions from wood frame furniture
Haul wood furniture to fire pit & cut
Hang sister joists
Install new joists
Frame in two walls, closet, bathroom wall in living room
Outside jobs


Install Hummingbird Farm sign
New mailbox
Dig and install new chicken run fence posts
Cleanup/out yard trash and out buildings

The Menu:
There will be plenty of drink and snacks. 
Breakfast: Coffee cake
Lunch: chili dogs
Dinner: pulled pork, brisket, mac and cheese, baked beans; to be served roughly 4-430
At 4:00, we can light a fire outside, and we will work in the house til dark; hang by the fire as long as you'd like.
We'll be back at it Sunday - with any leftovers. :)



I mentioned that the living room floor was leveled on Saturday. Here are some before and after pics:
The light stradles the middle of the floor. You can see the slope down on each side...and all the plywood and shim wood Ghon had to remove that was previously leveling out the floor.

Steve in the root cellar shimming beams to help level the floor.

Floor support in the root cellar. 


The newly leveled floor, well, at least the right side.